We utilised the dumbwaiter to lift the bales that were stacked on the ground floor up to the first floor. And we've now started to infill the cruck frame above the floor with bales.

Tomorrow another 220 bales are being delivered. Initially they will be stacked downstairs. They will be hoisted up as we need them.