At the end of August the PIR insulation for the floor was delivered. There was not time to install it, lay the underfloor heating and pour the screed before the plasterers returned last week. We need to make sure that the insulation doesn't get wet or damaged. All we could do was to store it in the strawbale where unfortunately it is right in the way.