top of page

Top up

  • Aug 12, 2016
  • 1 min read

Topping off with mortar and incorporating a fall between the inner to outer leaf of the plinth wall (The Fall , 31st July 2016) resulted in a gap at the top of the insulation. We needed something thin to top up and fill the gap. We found these 25mm EPS boards at B&Q which were just the job.

Comments


RECENT POSTS:
SEARCH BY TAGS:

© 2023 by NOMAD ON THE ROAD. Proudly created with Wix.com

  • b-facebook
  • Twitter Round
  • Instagram Black Round
bottom of page