Under our feet
At the end of August the PIR insulation for the floor was delivered. There was not time to install it, lay the underfloor heating and...


Bumpy-wumpy
A couple of weeks ago we had another 16 bags of Fibrechalk delivered. The plasterers were back on site last week. They didn't get the...


Baywatch
An early eBay purchase was this section of the gallery removed from Salem Baptist Church, Ramsey. Our building fund is rapidly...
The waiting game
Whilst we await the arrival of the windows (3 - 4 months) we decided to crack on with installation of the floor insulation, underfloor...


Happiness is...
... a washiing machine! We've been without one since we moved to the grungelow nearly 3 years ago. Up until now washing has been a huge...
Window pain
Our plan was to have anthracite grey coloured powder-coated aluminium windows. We knew that the windows would be a major expense but were...


Struck down
The scaffolding along the sides of the building has been struck (removed) revealing the newly tiled roof in all its glory....


A roof over our head
The roofer has finished the tiling. It looks fantastic. The roof was topped out with a holly bough, Dorset County flag and a flying pig....


Besmirched
Staining on the interior lime plaster where the rain came through. #strawbalewoodlands #strawbalehouse #limeplaster #roof #raindamage


Almost there
Another couple of days and the roof should be finished. #strawbalewoodlands #strawbalehouse #rooftiles